# From notes to six usable work files

## One fictional source, six outputs
Use the downloadable Sea Almond training-pack inputs, not real customer records: tasks T01 count chairs (Ana, 30 min), T02 check projector (Luis, 20 min), T03 print agenda (Ana, 10 min); 12 attendees; event 14 December 2026, 10:00. Ana/Luis are invented. All minutes are estimates, not measured savings.
1. **Word-compatible document:** ask “Turn these notes into an agenda with title, date, three tasks, owners and unresolved questions; do not invent a room.” Copy into Word or free LibreOffice Writer. Use heading styles, a real table and descriptive links; save as .docx. Open again to check names, date, line wrapping and reading order. The supplied exemplar .docx is editable.
2. **PDF:** in Writer choose Export as PDF (Word commonly uses Save As/Export). Enable tagged PDF/accessibility where available. Check the exported pages, selectable text and headings; inspect with accessibility tools if available. The supplied PDF is a fixed example, not proof of universal accessibility.
3. **Spreadsheet:** open the CSV in LibreOffice Calc or Excel; minutes go in C2:C4. Enter =SUM(C2:C4) in C5: 60. In another cell =COUNTIF(B2:B4,"Ana"): 2. Independent check: 30+20+10=60. The exemplar .xlsx includes these formulas and cached expected results. Do not accept a generated formula without checking range, numbers and locale separators. CSV stores values, not formula formatting.
4. **Slides:** ask for three slides: purpose/date; task table; missing room and reviewer decision. Use free LibreOffice Impress or PowerPoint; one message per slide, large text, sufficient contrast and speaker notes. Open the supplied .pptx and revise—not an image of slides. Verify 12 attendees remains 12 everywhere.
5. **Report:** prompt “Summarize planned effort, assigned tasks and open risks; label estimates.” Expected: 60 planned staff-minutes, 3 tasks, 2 owners, room unresolved. Do not claim the work is complete or time was saved. Compare with spreadsheet, then approve the .docx report.
6. **Meeting handover:** record decisions, action ID, owner, due time, evidence and status. “T02 Luis: projector check; due before 10:00; status pending; evidence not yet supplied.” Send only after the owner confirms; do not convert discussion into a false commitment. The editable handover template separates proposals from approved actions.

### Free/no-account route
Download files and open them offline in free LibreOffice; alternatively read the bilingual Markdown pack and calculate on paper. No Microsoft subscription, AI file-generation tool, external account, upload or submission is needed for certification. Verify output content and file compatibility rather than merely trusting that an extension says .docx or .xlsx.